Bidder wins project on lottery drawing

Lake Pleasant pilings to be replaced in July

PORT ANGELES — A lottery drawing determined a winner after two bids for a Lake Pleasant project came in the same.

The successful bidder at Monday’s Clallam County commissioners work session was Quigg Bros. Inc. of Aberdeen for $82,000. The project is scheduled to start July 17 and be substantially complete by July 26.

Lake Pleasant Park is located a short distance off U.S. Highway 101 in Beaver, 10 miles north of Forks on West Lake Pleasant Road. It provides a boat launch, loading and mooring docks, accessible restrooms, parking and a playground.

The county park offers shoreline access, although most of the lake is private ownership.

The project will require closure of the parking lot, which the company needs for staging materials and equipment. It will be funded by a $140,000 grant from the state’s Recreation and Conservation Office.

The bid will be formally awarded at the commissioners’ next regular meeting, set for 10 a.m. April 23 in the commissioners meeting room at the Clallam County Courthouse, 223 E. Fourth St. in Port Angeles.

The commissioners had called for bids March 11 to replace Lake Pleasant boat launch pilings damaged in a November 2021 storm. Four companies submitted bids.

East Slope Earthworks of Cle Elum bid $83,713 and Brumfield Construction Inc. of Aberdeen bid $135,000. Watersmith Construction Inc. of Tumwater and Quigg Bros. Inc. both bid $82,000.

“I had two qualifications besides price,” said Don Crawford, director of the county’s Parks, Fair and Facilities Department. “One was the fish window opens July 16 and both could start on July 17. The other was they had to finish by July 26, and both said they could.

“They were both for the exact amount, and both bids were essentially the same,” Crawford said. “There was no quantifiable way to disqualify one. The county code states that if two or more lowest responsible bids are essentially equivalent in quality, cost and ability to perform, the contract shall be awarded to one of the lowest responsible bidders by drawing lots in public.”

However, the county code lacks details regarding the exact procedure, so county engineer Joe Donisi suggested referring to the state Department of Transportation’s Standard Specifications for Road, Bridge and Municipal Construction.

One paper was marked “successful bidder” and the other “unsuccessful bidder.” Then two drew alphabetically for winner.

“I’m real excited for the project to get going,” Crawford said.

Since the bid amount is less than the state grant, Crawford will see if the remaining grant funds can be used to remove three or four dilapidated creosote pilings and whether the current construction permit can be expanded to include that.

“Nobody is opposed to removing those,” he said. “It’s just if the state will allow funding from the grant and if we can expand scope of the permit to allow it.”

________

Reporter Brian Gawley can be reached by email at brian.gawley@peninsuladailynews.com.

More in News

Two people were displaced after a house fire in the 4700 block of West Valley Road in Chimacum on Thursday. No injuries were reported. (East Jefferson Fire Rescue)
Two displaced after Chimacum house fire

One person evacuated safely along with two pets from a… Continue reading

A Port Angeles city worker places a tree topper on the city’s Christmas tree, located at the Conrad Dyar Memorial Fountain at the intersection of Laurel and First streets. A holiday street party is scheduled to take place in downtown Port Angeles from noon to 7 p.m. Nov. 30 with the tree lighting scheduled for about 5 p.m. (Emma Maple/Peninsula Daily News)
Top of the town

A Port Angeles city worker places a tree topper on the city’s… Continue reading

Hospital board passes budget

OMC projecting a $2.9 million deficit

Lighthouse keeper Mel Carter next to the original 1879 Fresnel lens in the lamp room at the Point Wilson Lighthouse. (Elijah Sussman/Peninsula Daily News)
Donations to aid pediatrics clinic, workforce

Recipients thank donors at hospital commissioners’ meeting

Whitefeather Way intersection closed at Highway 101

Construction crews have closed the intersection of Whitefeather Way and… Continue reading

EYE ON THE PENINSULA: Commissioners to consider levies, budgets

Meetings across the North Olympic Peninsula

Highway 112 partially reopens to single-lane traffic

Maintenance crews have reopened state Highway 112 between Sekiu… Continue reading

Laken Folsom, a Winter Ice Village employee, tries to remove leaves that blew in from this week’s wind storm before they freeze into the surface of the rink on Thursday. The Winter Ice Village, operated by the Port Angeles Chamber of Commerce in the 100 block of West Front Street, opens today and runs through Jan. 5. Hours are from noon to 9 p.m. daily. New this year is camera showing the current ice village conditions at www.skatecam.org. (Dave Logan/for Peninsula Daily News)
Ice village opens in Port Angeles

Laken Folsom, a Winter Ice Village employee, tries to remove leaves that… Continue reading

Fort PDA receiver protecting assets

Principal: New revenue streams needed

Ella Biss, 4, sits next to her adoptive mother, Alexis Biss, as they wait in Clallam County Family Court on Thursday for the commencement of the ceremony that will formalize the adoption of Ella and her 9-year-old brother John. (Emma Maple/Peninsula Daily News)
Adoption ceremony highlights need for Peninsula foster families

State department says there’s a lack of foster homes for older children, babies

Legislature to decide fate of miscalculation

Peninsula College may have to repay $339K