Construction fencing surrounds the site of a future performing arts center at Front and Oak streets in downtown Port Angeles. (Keith Thorpe/Peninsula Daily News)

Construction fencing surrounds the site of a future performing arts center at Front and Oak streets in downtown Port Angeles. (Keith Thorpe/Peninsula Daily News)

Groundbreaking set for performing arts center

Field Arts & Events Hall after-party at Barhop Brewing

PORT ANGELES — Construction on the Field Arts & Events Hall is about to begin.

An invitation-only ground-breaking for the 41,000-square-foot facility at the corner of Front and Oak streets is set for 6 p.m. Friday and will be immediately followed at 8 p.m. with an after-party to which the public is invited.

The after-party will go on until 10 p.m. at Barhop Brewing and Artisan Pizza at 124 W. Railroad Ave. and will feature drawings of the new building, as well as the team that designed it.

A dollar from each pint sold will be donated to the capital campaign for the building.

“We’re still raising money,” said Chris Fidler, executive director of Field Arts and Events Hall.

“We have enough to construct the building and now need to raise the remainder and get it finished.”

The total cost is expected to be about $30 million to $31 million.

Permits for the project are expected “any day now,” Fidler said, adding that plans are undergoing a final review.

The 41,000-square-foot Field Arts & Events Hall is the first of the three buildings planned as the Port Angeles Waterfront Center on the 1.6-acre plot now occupied by a Black Ball Ferry Line parking lot and a grassy area.

The campus will include a Lower Elwha Klallam tribal longhouse, and the Marine Discovery Center, a joint project to house the Feiro Marine Life Center and a visitor center for the Olympic Coast National Marine Sanctuary.

The conditional use permit for the arts center seeks to exceed the city’s 45-foot building height restriction by 5.4 feet at the center of the two-story building, where the 500-seat Morris Auditorium — named after the late Donna M. Morris, who bequeathed the initial $9 million for the “design, construction and maintenance” of a performing arts center in Port Angeles when she died in 2014.

The tallest point is 40.4 feet for the rest of the building, which would include a coffee shop, meeting facilities for up to 300 people and a 1,000-square-foot art gallery that Brooke Taylor, Waterfront Center board chairman, has said he hopes the Port Angeles Fine Arts Center will help run. The Fine Arts Center was named as a will partner in Morris’ bequest.

The design of the new structure, which is expected to be completed in late spring or early summer 2021, is by LMN Architects of Seattle and the contractor is Mortenson Construction, which is based in Minneapolis, Minn., and has an office in Seattle.

The performing arts center is named after Dorothy Field, a Waterfront Center board member who donated $1.43 million to buy the parcel.

For more information on the project and capital campaign, or to donate, visit www.fieldhallevents.org or call Jessica Hernandez, director of development, at 360-477-4679.

The office at 219 N. Oak St. also is open from 9 a.m. to 5 p.m. Mondays through Fridays, and contains artists renderings of the project.

More in News

Kennel containing puppies hit by vehicle on highway

A kennel containing puppies fell out of a truck and… Continue reading

Firefighters with Clallam County Fire District 3 work to extinguish a fire Tuesday afternoon in the 100 block of Barnes Road. (Matthew Nash/Olympic Peninsula News Group)
Man found dead following house fire

A man was found dead inside a home after a… Continue reading

With standing water over the roads this time of year, big splashes from puddles is expected. This garbage truck heading out on Ediz Hook on Wednesday unleashes a large spray from a big puddle on the road. (Dave Logan/for Peninsula Daily News)
Road wash

With standing water over the roads this time of year, big splashes… Continue reading

Period now open for health questions

Open enrollment runs through Dec. 7

Port Townsend expects $18M in public works expenditures next year

Director covers more than $73M in six-year capital facilities plan

Derek Kilmer.
Congressman Kilmer to work with Rockefeller Foundation

Twelve years in Congress to come to an end

Former state Sen. Kevin Van De Wege, D-Lake Sutherland, said 18 years in public office was a “life-altering experience.” (Kevin Van De Wege)
Van De Wege reflects on political career

Former senator to continue firefighting, begin consulting

Boys Girls club raises $600K at annual event

The Boys & Girls Clubs of the Olympic Peninsula raised… Continue reading

Tracy Ryan, a nurse at Jefferson Healthcare in Port Townsend, stands in front of one of the hospital’s maternity ward rooms. (Grace Deng/Washington State Standard)
Rural maternity wards are struggling to stay afloat

State and federal lawmakers are trying to help

Jefferson County approves transportation plan

Six-year improvement outlook budgeted for more than $94M

Rainwater collection presentation canceled

The Rainwater Collection 101 presentation scheduled for 6:30 p.m.… Continue reading