Hood Canal Bridge to be closed for three nights this week

No crossing between 11 p.m. and 4 a.m. Tuesday, Wednesday, Thursday

SHINE — Travelers are encouraged to plan for three nights this week when the Hood Canal Bridge will stay closed to vehicles all night long.

As construction crews work on the span, the bridge will be closed:

• 11 p.m. Tuesday through 4 a.m. Wednesday.

• 11 p.m. Wednesday through 4 a.m. Thursday.

• 11 p.m. Thursday through 4 a.m. Friday.

There may be unscheduled times, when work allows, that the bridge will open to travelers. And the work could be rescheduled altogether due to weather, according to the state Department of Transportation (DOT).

The closures are to allow construction crews to bolster the bridge’s center lock, an element similar to a door’s deadbolt.

The lock needs strengthening, DOT said, so it can better withstand tremendous forces, especially during powerful winter storms and tides.

Crews also will make permanent repairs to another system: the twin metallic objects shaped like pyramids on one half of the bridge, which help guide the bridge into dual receivers on the second half.

Workers will temporarily remove both pyramids and their metal plates and then reinstall them using industrial-sized bolts, DOT said.

Last winter, maintenance crews made temporary repairs on these elements; this year contractor crews are finishing permanent repairs.

For more information, see Hoodcanalbridge.com.

More in News

Holly Hildreth of Port Townsend, center, orders a latte for the last time at the Guardhouse, a cafe at Fort Worden State Park, on Wednesday. At noon the popular cafe was to close permanently, leaving an empty space for food, drinks and restroom facilities in the park. (Steve Mullensky/for Peninsula Daily News)
Fort Worden Hospitality closes business operations

Organization faced with ‘legal limbo’ because lease was rejected

Clallam fire districts providing automatic support

Mutual aid helps address personnel holes

Port Angeles school board to meet with hiring agency

The Port Angeles School District board of directors will… Continue reading

Clallam County to host meeting to develop animal disaster plan

The Clallam County Sheriff’s Office’s Emergency Management division will… Continue reading

The Western Harbor Study Area includes Port Angeles Harbor, the Port of Port Angeles and Ediz Hook. (State Department of Ecology)
Comment period to open on Port Angeles Harbor cleanup

The state Department of Ecology will open a public… Continue reading

C.J. Conrad and Chris Orr of A&R Solar take solar panels from a lift on top of the Port Angeles Senior and Community Center on Peabody Street to be installed on the roof. The 117 panels are mostly made of silicone and will provide electrical power to the center. The crew members are each tied in with ropes to prevent any problems on the slippery slanted roof. The panels are 42 inches by 62 inches and weigh about 16 pounds. (Dave Logan/for Peninsula Daily News)
Solar installation

C.J. Conrad and Chris Orr of A&R Solar take solar panels from… Continue reading

Port Townsend Food Co-op board president resigns

Rowe cites unresolved tensions, calls for change

Recompete projects aim to close gap for workers in prime age

Goals include reducing barriers, creating up to 1,300 jobs

Carrie Heaton.
Governor appoints Heaton to PC trustees

Five-member board governs college’s policy, strategic planning

Finalists named for Port Angeles community awards

The Port Angeles Chamber of Commerce will announce the… Continue reading

Fort Worden Hospitality ceasing operations

No longer viable amid PDA financial and legal challenges