Hundreds of schoolchildren are among the first to walk across the new three-lane Lauridsen Boulevard bridge over Peabody Creek following ribbon-cutting ceremonies Monday.  — Photo by Arwyn Rice/Peninsula Daily News

Hundreds of schoolchildren are among the first to walk across the new three-lane Lauridsen Boulevard bridge over Peabody Creek following ribbon-cutting ceremonies Monday. — Photo by Arwyn Rice/Peninsula Daily News

Hundreds of kids among first to walk across new Lauridsen Boulevard bridge in Port Angeles

PORT ANGELES — More than 400 students and staff from Franklin Elementary School joined roughly 30 local residents to open the Lauridsen Boulevard bridge over Peabody Creek on Monday morning.

The crowd gathered at the bridge’s midpoint as sixth-grader and student body president Ella Holland, 11, helped Port Angeles Mayor Dan Di Guilio, Project Manager Mike Wilson of Scarsella Brothers Inc., and Exeltech Inc. President Santosh Kurvilla cut a giant red ribbon tied across the $5.8 million, three-lane bridge.

Kent-based Scarsella Brothers was the general contractor on the project, and the engineering design was completed by Exeltech, a company based in Lacey with an office in Port Angeles.

It replaces a narrow two-lane bridge built in 1969 and determined by engineers to be structurally deficient and functionally obsolete.

The old bridge was closed and demolished in August, forcing traffic to use detours around the project.

The city received a $4.7 million grant from the state Department of Transportation for the replacement, and the city paid the remaining $1.1 million cost.

The new bridge was presented to the crowd by Craig Fulton, director of Port Angeles Public Works and Utilities.

“This new bridge design will greatly enhance citizen access to many important destinations along the Lauridsen Boulevard corridor, no matter what mode of travel they may choose,” Fulton said.

The bridge is 147 feet long and has two traffic lanes, a turn lane for cars turning left to South Race Street, two 5-foot-wide bicycle lanes and 6.5-foot-wide sidewalks.

Visually, the bridge design resembles the two Eighth Street bridges with metal rails above a concrete safety divider.

Students from the school, located a block east of the bridge at the corner of South Washington and East Lauridsen Boulevard, crossed the bridge en masse as the ribbon fell.

After the walk was over, members of the city council became the first non-construction drivers to cross the bridge in their vehicles.

Within minutes of the ceremony’s end, the new traffic lights at the intersection of Lauridsen and South Race were functioning, including crosswalk signals that verbally announce crossing information to pedestrians.

A block south of the newly reconfigured intersection, a temporary four-way stop at South Race Street and East Park Avenue that had been installed for improved traffic control during the project became permanent with new metal posts and pavement markings.

“It was pretty unanimous among the many residents and police. The four-way stop improved safety and traffic flow,” Fulton said.

________

Reporter Arwyn Rice can be reached at 360-452-2345, ext. 5070, or at arwyn.rice@peninsuladailynews.com.

More in News

Impacts go beyond owners of short-term rentals

House cleaners, yard care workers expect to lose income

Seth Stewart of Silverdale-based Hanson Signs inspects the side panels on a new business sign at Swain’s General Store in Port Angeles on Thursday. Swain’s general manager Don Droz said the original iconic sign dated back to the 1960s and was in need being replaced. Droz said the neon-lit lettering from the old sign was preserved and incorporated into the new marquee. (Keith Thorpe/Peninsula Daily News)
New marquee

Seth Stewart of Silverdale-based Hanson Signs inspects the side panels on a… Continue reading

Olympic Medical Center to hire two urologists

Doctors recently completed residencies in Connecticut, Utah, respectively

Law books available at no cost

The Clallam County Law Library is disposing of surplus… Continue reading

Port Angeles to host storefront studio sessions next week

The city of Port Angeles will conduct a series… Continue reading

David Fletcher, left, and Sean Hoban.
Clallam County sheriff promotes two deputies

Clallam County Sheriff Brian King has promoted Deputy David… Continue reading

The Whiskey Creek bridge, located near milepost 18 on the 25-mile Olympic Adventure Trail route, is 60 feet long, 6 feet wide and cost about $83,106. (Clallam County)
Whiskey Creek bridge replacement complete

$83,000 project funded by Clallam County lodging tax

Clallam County to take lead in applying for septic replacement grants

Agency aims to replace Flaura’s Acres failing septic system

Wildcat Cafe at Lincoln School reopening Tuesday

The double-cross club and the Cobb conspiracy might sound… Continue reading

EYE ON BUSINESS: This week’s meetings

Breakfast meetings with networking and educational… Continue reading

Port Angeles Parks Department workers walk along the Port Angeles City Pier moorage floats after they were removed for seasonal storage on Tuesday. The floats will be towed to a storage area near the McKinley Paper mill to protect them from winter winds and waves. (Keith Thorpe/Peninsula Daily News)
Seasonal storage

Port Angeles Parks Department workers walk along the Port Angeles City Pier… Continue reading