New hatchery built for Elwha River dam removals gets first batch of fish

PORT ANGELES — The fish that will one day replenish the Elwha River have a new birthplace.

The Lower Elwha Klallam tribe’s new fish hatchery was completed May 13 and has received its first batch of steelhead fry.

The hatchery, part of the Elwha River restoration project, has 160,000 juvenile fish swimming in two of the new hatchery ponds. Many more — including pink, chum and coho salmon — are soon expected.

Following removal of the river’s two dams, which will begin in September, the tribe will release as many as 3 million fish a year throughout the 65-mile-long waterway in areas off limits to spawning salmon for nearly a century.

The tribe and National Park Service, which is heading the $327 million river restoration project, are hoping enough will return to restore the once fabled salmon runs. It’s no small task, and the tribe realizes it has few examples from which to learn.

“I think we are really writing the book on how to do this,” said Larry Ward, tribal hatchery manager.

Only five miles of river have been available to spawning salmon since the first dam on the stream was built in 1913.

Demolition of the Elwha Dam, and its cousin, Glines Canyon Dam, will take three years to complete.

The park service has estimated salmon runs will reach 400,000 annually by 2039, much more than the 3,000 the river currently hosts each year.

Ward said he expects the runs to be restored, but he was hesitant to say how long it will take.

“We’ll just have to play it by ear,” he said.

Robert Elofson, the tribe’s natural resources director, called the new hatchery on Stratton Road “state of the art.”

Paid for by the park service, it cost $16.4 million to build and is about three times bigger than the tribe’s other hatchery, which was built in 1978.

The older hatchery will run for the next two years before being decommissioned, Ward said. That will give enough time for spawning salmon released last year to return.

Ward said he expects the new hatchery also will be decommissioned once the runs are restored.

In the meantime, the tribe will continue to relocate its juvenile fish and eggs to the new facility.

About 500,000 juvenile coho salmon will be transferred in the next few weeks, followed by up to 500 more steelhead in July. Eggs will be transferred this fall.

________

Reporter Tom Callis can be reached at 360-417-3532 or at tom.callis@peninsuladailynews.com.

More in News

Two people were displaced after a house fire in the 4700 block of West Valley Road in Chimacum on Thursday. No injuries were reported. (East Jefferson Fire Rescue)
Two displaced after Chimacum house fire

One person evacuated safely along with two pets from a… Continue reading

A Port Angeles city worker places a tree topper on the city’s Christmas tree, located at the Conrad Dyar Memorial Fountain at the intersection of Laurel and First streets. A holiday street party is scheduled to take place in downtown Port Angeles from noon to 7 p.m. Nov. 30 with the tree lighting scheduled for about 5 p.m. (Emma Maple/Peninsula Daily News)
Top of the town

A Port Angeles city worker places a tree topper on the city’s… Continue reading

Hospital board passes budget

OMC projecting a $2.9 million deficit

Lighthouse keeper Mel Carter next to the original 1879 Fresnel lens in the lamp room at the Point Wilson Lighthouse. (Elijah Sussman/Peninsula Daily News)
Donations to aid pediatrics clinic, workforce

Recipients thank donors at hospital commissioners’ meeting

Whitefeather Way intersection closed at Highway 101

Construction crews have closed the intersection of Whitefeather Way and… Continue reading

EYE ON THE PENINSULA: Commissioners to consider levies, budgets

Meetings across the North Olympic Peninsula

Highway 112 partially reopens to single-lane traffic

Maintenance crews have reopened state Highway 112 between Sekiu… Continue reading

Laken Folsom, a Winter Ice Village employee, tries to remove leaves that blew in from this week’s wind storm before they freeze into the surface of the rink on Thursday. The Winter Ice Village, operated by the Port Angeles Chamber of Commerce in the 100 block of West Front Street, opens today and runs through Jan. 5. Hours are from noon to 9 p.m. daily. New this year is camera showing the current ice village conditions at www.skatecam.org. (Dave Logan/for Peninsula Daily News)
Ice village opens in Port Angeles

Laken Folsom, a Winter Ice Village employee, tries to remove leaves that… Continue reading

Fort PDA receiver protecting assets

Principal: New revenue streams needed

Ella Biss, 4, sits next to her adoptive mother, Alexis Biss, as they wait in Clallam County Family Court on Thursday for the commencement of the ceremony that will formalize the adoption of Ella and her 9-year-old brother John. (Emma Maple/Peninsula Daily News)
Adoption ceremony highlights need for Peninsula foster families

State department says there’s a lack of foster homes for older children, babies

Legislature to decide fate of miscalculation

Peninsula College may have to repay $339K