Michael Poats, left, and Brody Merritt of the Port Angeles stormwater department work to install a pump to remove standing water from a flooded area near the playground at Shane Park in Port Angeles on Wednesday.
The pool of standing water, which is up to 3 feet deep in places and has at times covered the nearby play equipment, is to be pumped to a nearby storm drain.