Brian Tucker, left, and Kevin Smith, workers with the Sequim branch of Neely Construction Co., remove a section of rusted railing at Port Angeles City Pier on Thursday. The project calls for replacement of 1,300 linear feet of pedestrian railings that were installed in the 1970s with corrosion-resistant galvanized steel barriers around the pier and walkways. The project is expected to be completed in June.