A Clallam Transit bus passes through a flooded intersection at First and Lincoln streets in downtown Port Angeles after heavy rains associated with a passing thunderstorm dropped copious amounts of precipitation over a short period around the area on Monday afternoon. Numerous lightning strikes were recorded during the deluge. (Keith Thorpe/Peninsula Daily News)

A Clallam Transit bus passes through a flooded intersection at First and Lincoln streets in downtown Port Angeles after heavy rains associated with a passing thunderstorm dropped copious amounts of precipitation over a short period around the area on Monday afternoon. Numerous lightning strikes were recorded during the deluge. (Keith Thorpe/Peninsula Daily News)

Sound and fury, but little moisture in storm

Snow on Olympic Mountains only amounts to a trace

PORT ANGELES — Monday afternoon’s rainstorm was fierce but short-lived, leaving little in the way of either official rainfall totals or snowpack, according to National Weather Service data.

Meteorologist Samantha Borth with the National Weather Service in Seattle said the North Olympic Peninsula rainfall totals ranged from about 0.4 of an inch to an inch, with about one to 1.5 inches on the coast and higher totals in the mountains.

Unofficial totals for the 36-hour period ending Tuesday were 0.41 in Port Townsend and half an inch in Port Angeles, she said.

The official NWS station at Quillayute received 1.3 inches.

As far as mountain snowpack, the snow visible in the Olympic mountains wasn’t enough to register at the National Resource Conservation Service’s SNOTEL (snow telemetry) sites.

Mount Crag (3,960 feet) reported zero current snow water equivalent. Waterhole (5,010 feet) reported 0.1 inches. Dungeness (4,010 feet) and Buckinghorse (4,870 feet) were missing data.

More in News

Highway 112 partially reopens to single-lane traffic

Maintenance crews have reopened state Highway 112 between Sekiu… Continue reading

Laken Folsom, a Winter Ice Village employee, tries to remove leaves that blew in from this week’s wind storm before they freeze into the surface of the rink on Thursday. The Winter Ice Village, operated by the Port Angeles Chamber of Commerce in the 100 block of West Front Street, opens today and runs through Jan. 5. Hours are from noon to 9 p.m. daily. New this year is camera showing the current ice village conditions at www.skatecam.org. (Dave Logan/for Peninsula Daily News)
Ice village opens in Port Angeles

Laken Folsom, a Winter Ice Village employee, tries to remove leaves that… Continue reading

Fort PDA receiver protecting assets

Principal: New revenue streams needed

Ella Biss, 4, sits next to her adoptive mother, Alexis Biss, as they wait in Clallam County Family Court on Thursday for the commencement of the ceremony that will formalize the adoption of Ella and her 9-year-old brother John. (Emma Maple/Peninsula Daily News)
Adoption ceremony highlights need for Peninsula foster families

State department says there’s a lack of foster homes for older children, babies

Legislature to decide fate of miscalculation

Peninsula College may have to repay $339K

The Sequim Valley Lions Club donated $5,000 the Sequim Unit of the Boys Girls Clubs of the Olympic Peninsula.
Mary Budke, on left, and Norma Turner, on right, received the donation on behalf of the Boys Girls Clubs.
Lions donation

The Sequim Valley Lions Club donated $5,000 the Sequim Unit of the… Continue reading

Jae McGinley
Jae McGinley selected for fellowship, scholarship

Jae McGinley has been selected for the Next Generation… Continue reading

A street sweeper on I Street in Port Angeles cleans up the street along the curbs of all the debris that blew down during Tuesday evening’s storm. Thousands were without power at the peak of the storm. (Dave Logan/for Peninsula Daily News)
Storm causes power outages, road closures

Smaller weather system may hit Friday

Port Angeles funds lodging tax requests

Sixteen applications to undergo review

Port Townsend’s Water Street sewer project gets funds

City council authorizes contracts; construction to start in January

Port of Port Angeles commissioners approve 2025 budget

Board OKs project that would treat seawater to make it less acidic