An earthmover prepares the parking lot at the Albert Haller Playfields for its pervious pavement. Joe Smillie/Peninsula Daily News

An earthmover prepares the parking lot at the Albert Haller Playfields for its pervious pavement. Joe Smillie/Peninsula Daily News

Water won’t pour off new parking lot in Sequim

SEQUIM –– A new stretch of pervious pavement is set to be laid today in the parking lot for the Albert Haller Playfields, part of the low-impact-development model at Sequim’s Water Reuse Demonstration Park.

With a lighter adhesive in the asphalt mix together, the pavement is porous enough to allow water to drain into the ground.

“So it ends up being kind of like a Rice Krispies cake, and the water can go through,” Conservation District Manager Joe Holtrop said.

A joint effort between the city and the Clallam Conservation District, the surface is a fairly new technology to the North Olympic Peninsula, Holtrop said.

“We do a lot of it down in Bremerton, but it really hasn’t shown up in a whole lot of places around here,” said Robert LaBelle, part of a crew from contractor Lakeside Industries of Port Angeles.

Lakeside crews prepared the ground with roughly graded rock Thursday.

LaBelle said the rough-grade foundation is key to allowing stormwater to filter through the pavement into soil instead of running off the street into pools.

Runoff in Sequim typically is collected in catch basins to drain and filter through the soil into the aquifer, Holtrop said.

This project is part of an agreement between the city and the Clallam Conservation District for a low-impact-development demonstration project.

The Albert Haller Playfield parking lot has been closed until today, but the playfields have been open.

Grants from the state Department of Ecology, Conservation Commission and federal Environmental Protection Agency are paying the bulk of the cost of the low-impact development of the park.

Drought-resistant plants have been planted to the south of the parking lot, and a demonstration rain garden will be finished as soon as next month.

The overall project has been a long time in the works, begun in 2008 by the Master Gardener Foundation of Clallam County and Washington State University’s Clallam Extension.

The two groups acquired the grants, but financial and time constraints forced them to back out.

Sequim-Dungeness Valley Editor Joe Smillie can be reached at 360-681-2390, ext. 5052, or at jsmillie@peninsuladailynews.com.

More in News

Red Parsons, left, Kitty City assistant manager who will help run the Bark House, and Paul Stehr-Green, Olympic Peninsula Humane Society board president and acting executive director, stand near dog kennels discussing the changes they are making to the Bark House to ensure dogs are in a comfortable, sanitary environment when the facility reopens in February. (Emma Maple/Peninsula Daily News)
Humane Society officials plan to reopen Bark House

Facility, closed since last July, could be open by Valentine’s Day

Clallam EDC awarded $4.2M grant

Federal funding to support forest industry

Firm contacts 24 agencies for potential OMC partner

Hospital on timeline for decision in May

Port Townsend nets $5.3 million in transportation grants

Public works considers matching funds options

Holly Hildreth of Port Townsend, center, orders a latte for the last time at the Guardhouse, a cafe at Fort Worden State Park, on Wednesday. At noon the popular cafe was to close permanently, leaving an empty space for food, drinks and restroom facilities in the park. (Steve Mullensky/for Peninsula Daily News)
Fort Worden Hospitality closes business operations

Organization faced with ‘legal limbo’ because lease was rejected

Clallam fire districts providing automatic support

Mutual aid helps address personnel holes

Port Angeles school board to meet with hiring agency

The Port Angeles School District board of directors will… Continue reading

Clallam County to host meeting to develop animal disaster plan

The Clallam County Sheriff’s Office’s Emergency Management division will… Continue reading

The Western Harbor Study Area includes Port Angeles Harbor, the Port of Port Angeles and Ediz Hook. (State Department of Ecology)
Comment period to open on Port Angeles Harbor cleanup

The state Department of Ecology will open a public… Continue reading

C.J. Conrad and Chris Orr of A&R Solar take solar panels from a lift on top of the Port Angeles Senior and Community Center on Peabody Street to be installed on the roof. The 117 panels are mostly made of silicone and will provide electrical power to the center. The crew members are each tied in with ropes to prevent any problems on the slippery slanted roof. The panels are 42 inches by 62 inches and weigh about 16 pounds. (Dave Logan/for Peninsula Daily News)
Solar installation

C.J. Conrad and Chris Orr of A&R Solar take solar panels from… Continue reading

Port Townsend Food Co-op board president resigns

Rowe cites unresolved tensions, calls for change